Safety audit
Buildings can present a great number of risks, both in construction and operation. The Health and Safety Executive (HSE) estimate that around 4% of construction workers suffer from a work-related illness every year, and 3% sustain a work-related injury. This results in around 2.2 million working days being lost each year.
Safety audits are carried out to assess health and safety processes on construction sites, considering; legislative requirements, industry best practice, and the contractor’s own health and safety management syst.
They can demonstrate that a proactive approach is being taken to safety, can help to improve ways of working and ensure procedures are being followed, as well as demonstrating compliance with regulations such as the Construction (Design and Management) Regulations 2015, which require reasonable steps are taken to ensure the health and safety arrangements made for managing the project are maintained and reviewed throughout a project.
Regular audits can form a crucial part of the project management process, and may be undertaken by in-house personnel, or by an independent auditing body.
Some of the issues that might be assessed during a safety audit include:
- Notices and signage are appropriate and in place, clear and visible.
- Zones and activities are effectively separated from one another.
- Access routes and walkways are well demarcated.
- Hazardous substances are properly contained.
- A health and safety plan is in place.
- First aid equipment and first aiders are available.
- There are processes for reporting accidents on site and near misses, and learning from issues that emerge.
- There is an effective emergency strategy in place.
- Evacuation routes are in place.
- Workers are provided with the appropriate personal protective equipment (PPE).
- There are appropriate welfare facilities.
- There is provision in place for safety training, such as site inductions, toolbox talks, safety briefings and so on.
- The site boundary is secure.
- There is appropriate lighting and security measures in place.
- The site is relatively clear of debris and materials are appropriately stored.
- Management systems are in place to ensure that duties under CDM are fulfilled.
- The Health and safety file is accurate and up-to-date.
- Subcontractors are conforming to the health and safety requirments of the main contractor.
Safety audits differ from safety inspections in that they are organised at the discretion of the client or contractor, rather than being undertaken without notice by the Health and Safety Executive (HSE).
[edit] Related articles on Designing Buildings
- Accident report.
- Automated external defibrillator AED.
- CDM.
- Construction site inspection.
- Emergency plan.
- Facilities management audit FMA.
- First aider.
- Health and Safety Executive.
- Health and safety inspector.
- Health and safety plan.
- Incident reporting system.
- Risk assessment.
- Safety management.
- Scaffold register.
- Site information for design and construction.
- Site inspector.
[edit] External references
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.